Product Details:
Payment & Shipping Terms:
|
Manufacturer: | Die Casting Man | Material: | Die Casting Aluminium |
---|---|---|---|
Power: | 80-200W | Protectin Grade: | IP66 |
Color Rendering Index: | Ra≥70 | Input Voltage: | AC90-305V |
Color: | Grey/Black | Color Temperature: | 3000/4000/6500K |
Highlight: | outdoor light housing,street light housing |
OVERSIZED LIGHT SOURCE SURFACE
LARGE DIRVER CAVITY
LED Street Light ZHSL-18
Installing ways:Both Horizontal and Vertical available and adjustable angle -10°to+10°
Material: Die casting Aluminum body
Ultra clear tempered glass and pc lens
Product Specification
Product Code | ZHSL-18-80 | ZHSL-18-150 | |
Input Wattage | 80W | 150W | |
Color Temperature | 3000/4000/6500 | 3000/4000/6500 | |
Luminous Flux | 9200-10400 lm | 16500-19500 lm | |
Input Voltage | AC90-305V | AC90-305V | |
Frequency Range | 50/60Hz | 50/60Hz | |
Power Factor | PF≥0.95 | PF≥0.95 | |
color rendering index | Ra≥70 | Ra≥70 | |
Temperature of Working Condition | -40--50℃ | -40--50℃ | |
Humidity of Working Condition | 20%-90%RH | 20%-90%RH | |
LED Lifetime | 50000h | 50000h | |
Protectin Grade | IP66 | IP66 | |
Installation Pipe Diameter | φ60mm | φ70mm | |
Installation Height | 5-8m | 10-12m |
Product Description
This series is a hight-performance street lighting available in three sizes
The luminaire is manufactured from high pressure die-casting aluminum.
It shall have a led efficiency up to 120 LM/W and will be capable of producing up to 18000 luminaire lumens
at 4000k finishend in Grey or Black as standard
Application
Motorways,Major roads,minor roads,roundabouts,crossing and industrial areas.
Detailed picture
FAQ
Q1. What is your terms of payment?
A:Usually,we accept T/T,irrevocable L/C at sight.For regular orders,we prefer 30% in advance,70% against the of B/L.For long term business relations, we have more advantage terms for payment.
Q2. What is your terms of delivery?
A: We accept FOB,CIF,etc. You can choose the one which is the most convenient or cost effective for you.
Q3: What is the lead time?
A:It usually takes 25 to 35 days after sample confirmation and receiving your advance payment. The specific delivery time depends on the items and the quantity of your order. If the item was non standard, we have to consider extra 10-15days for tooling/mould made.
Q4: How about tooling Charge?
A: Tooling charge only charge once when first order, all future orders would not charge again even tooling repair or under maintance.
Q5. Can you produce according to the samples or drawings?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6: How to solve the quality problems after sales?
A: Take photos of the problems and send to us. We will make a satisfied solution for you within three days after we confirm the problems.
Q7. What is your terms of packing?
A: Generally, we pack our goods in neutral cartons. If you have legally registered patent, we can pack the goods by your logo after getting your authorization letters.
Q8. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery. We have QC team comply with TQM,each step is in compliance tothe standards.
Contact Person: Ms. Jenny
Tel: 0086 13777291746
Fax: 86-574-65579302